Alcatel Bts Installation And Commissioning Pdf

8 1.1.1 Rack Configuration for Alcatel 9100 BTS DC Indoor. Required) after modification of the electric circuit (described in the Installation Manual). This checklist assumes you have read the applicable installation guide for your product and understand its procedures, including notes, warnings, cautions, and dangers. The “Installing, Provisioning, and Commissioning.

Kurve_sarajevo_kontakt, local_sex_finder_iphone_app, comment_rendre_une_femme_amoureuse_pdf, www.livebinders.com%2fplay%2fplay%2f2491315%3ftabid%3d2f1-05c4. Free_webcam_tube_video, nordmand_fupper_danske_kvinder_p?_dating, oglasi_za_upoznavanje_ona_trazi_njega_uzice, sajt_za_dopisivanje, oslo_festdrakt_rabattkode, https%3a%2f%2fwww.livebinders.com%2fplay%2fplay%2f2490104%3ftabid%3dfcd6e444-0b00-a03b-1512-b161ddb1eb12 creer_son_compte_badoo, https%3a%2f%2fwww.livebinders.com%2fplay%2fplay%2f2491106%3ftabid%3d85475be4-1822-f16c-dcba-bdced98675d4 zene_za_jednu_noc_oglasi_sa_slikom_nis, intalniri_pe_net_banking, ona_isce_njega_oglasi, sex_hver_dag, www.livebinders.com%2fplay%2fplay%2f2490239%3ftabid%3d42684eab-105c-bdb2. Mistress_barbara_ljubavni_oglasi, information.dk_sex_hipster, https%3a%2f%2fwww.livebinders.com%2fplay%2fplay%2f2488993%3ftabid%3d791752b6-72ae-ea70-f437-71ed77dd5356 omegle_alternative_loveroulette, www.livebinders.com%2fplay%2fplay%2f2490188%3ftabid%3d2c7ee3c7-62e3-1fb4. Avtokliker dlya mishi 100 klikov v sekundu.

Bts commissioning (alcatel lucent) • 1. Switch OFF the BTS cabinet and disconnect Abis connectors fromDDF before offline start • Disconnect the Abis connectorfrom The DDF • Switch ON the BTS cabinet breakers and connect the Laptop with BTS • User Name “COMMTE” Password“COMMTE” • Communication Port setting • OR • After connecting this windowwill be appear • Go toConfiguration-> BTS-SW Download-> to download BTS software • After BTS- SW downloadthis window will appear • Go to offlineFiles and select First File of Master File. • Go to offlineFiles and select First File of DDL file. • Click ok to startdownloading SW • BTS software starts to download. • All these Files aredownloaded • Go toConfiguration BTScommissioning • Click startcommissioning • Edit Qmux Address • Edit sector Mapping • Check AllTwin TRE’s. • Click EndCommissioning Click > Hardware setting>>BeginHW modification • Go to configuration> BTS commissioning Go to start commissioning> Edit Q1Address, Edit SectorMapping and Twin TRA setting as in offline.

• Go toconfiguration> Hardware setting>“EndModification” to end onlinecommissioning • Online commissioning steps Connect the Abis connector at DDF by verifying Tx/Rx cable properly. OML will be established after primary Abis has connected to DDF. Give hard reset to BTS after OML has established. Put site on Downloading from OMC. O&M will be established as downloading completes. Connect Laptop to BTS MMI port. Go to configuration>Hardware setting>Begin Hardware modification. • Online commissioning steps Go to configuration>BTS commissioning>start commissioning. Edit Qmux Address Edit sector mapping Check all Twin TRA setting. Click end commissioning and shift all modules from selected modules to available modules. Go to configuration>Hardware setting>End Hardware modification. Click “yes” when an automatically hardware modification window appears. Hw Audit will be run and all Hardware will be shown after sometime.

• ON Line Commissioning Completed Successfully. • Software components combiner Fan UnitHardwareShown insoftware window Tre’s clock Alarm card • Alarmswindow • Transceivers Shown in window • Transceivers Types Four type of Transceivers in Alcatel Equipment TRAGE>Gsm Single TRE TRADE>Dcs single TRE TGT09>Gsm Twin TRE TGT18>DCS Twin TRE TAGHE>High power TRE • VSWRShown in window • Sectors ShownIn window • Station units • BSC SBLs(security block levels)BTS OM & Sectors.Sec RSLs can be unlock from local Terminal. Silsiilay 2005 movie songs mp3 download. • Troubleshooting If a TRE or combiner is in “Not Operational” or “FOS” state then disable it then initialize it by using “init” command. If TRE or combiner can not operational by doing above command then remove it by using the following method. Go to configuration>>Hardware setting>>Begin HW modification. Go to Configuration>>Hardware setting>>Remove. Remove the Hardware from BTS. Window will be appear of Hardware removal, select the module to remove. Go to Configuration>>Hardware setting>>End Modification. Click ”yes” when configuration changes window appears.